Lenze E94AYCEP Instrukcja Użytkownika Strona 46

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 148
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 45
8 Monitoring
8.1 Monitoring functions of the Managing Node
47
Lenze · E94AYCEP communication module (POWERLINK MN/CN) · Communication Manual · DMS 6.0 EN · 02/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Settings
Monitoring function Description
EPL frame error (CRC) Weighted number of received faulty frames
• This error can occur due to very strong EMC interferences or by non-
POWERLINK-compliant nodes.
• Monitoring threshold: C13115/3
/ C14115/3
• Monitoring response: C13891/4 / C14891/4
EPL-Rx PDO contents This monitoring response defines the way the cyclic process data (PDO) will
be forwarded from the POWERLINK network to the standard device/
application in the event of an error. An error has occurred if no valid process
data is received and a failed Controlled Node is reported to the Managing
Node. The following settings are possible with C13885
/ C14885:
• 0: The valid data received last remains.
• 1: All data is set to the value "0".
EPL bootup error The Managing Node could not set the POWERLINK network to the
"NMT_xx_OPERATIONAL" status.
• Monitoring response: C13891/2
/ C14891/2
EPL cycle time violation Weighted number of non-executable POWERLINK cycles.
This error can occur if the network nodes do not behave in a POWERLINK-
compliant way or the Managing Node / the network is overloaded (wrong
POWERLINK cycle time).
• Monitoring threshold: C13117/3
/ C14117/3
• Monitoring response: C13891/1 / C14891/1
EPL failure - slave feedback If at least one Controlled Node defined via C13028 / C14028 has failed, the
set monitoring response (C13891/5
/ C14891/5) is executed.
Przeglądanie stron 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 147 148

Komentarze do niniejszej Instrukcji

Brak uwag