Lenze E84AYCPM Instrukcja Użytkownika Strona 22

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 115
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 21
Lenze · E84AYCPM communication module (PROFIBUS®) · Communication Manual · DMS 5.0 EN · 11/2012 · TD17 22
5 Installation
5.1 Mechanical installation
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5.1 Mechanical installation
The communication module can be plugged into the MCI slot or unplugged while the inverter is
switched on. When the module is plugged in, it is detected automatically, and a plausibility check
regarding the function and version is carried out.
5.1.1 Mounting for 0.25 kW and 0.37 kW standard devices
[5-1] Mounting for 0.25 kW and 0.37 kW standard devices
Mounting steps
1. Pry the cover out of the MCI slot using a screwdriver and remove it (1, 2).
2. Loosen the securing screw for the communication module on the standard device (3).
3. Insert the communication module into the MCI slot of the standard device (4).
4. Fasten the securing screw (5).
E84YCPM002D
Przeglądanie stron 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 114 115

Komentarze do niniejszej Instrukcji

Brak uwag