5 Installation check
After completing the installation, check ...
ƒ The wiring for completeness, short circuit and earth fault.
ƒ The power connection:
– Mains connection via terminals L1, L2, L3 (X21)
– Connection of RFI filter / mains choke
– Connection of brake resistor (internal/external) via terminals BR0, BR1
(X22)
– Polarity of the DC−bus voltage supply via terminals +U
G
, −U
G
(X22)
ƒ Control connection (X6):
– Supply of 24 V supply, GND
– Thermal detector contact of external brake resistor or bridge if internal
brake resistor is used at terminals T1, T2.
– Wiring adjusted to the signal assignment of the control terminals.
ƒ Communication via system bus (CAN).
Note!
The next step is the commissioning. Relevant information can be
found in the detailed documentation of the power supply module.
ƒ Read the detailed documentation before switching on the power
supply module!
ƒ Perform the commissioning according to the instructions in the
detailed documentation!