Lenze PC-based Automation Industrial PC Instrukcja Użytkownika Strona 120

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 226
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 119
Industrial PC | Parameter setting & configuration
Visualisation with »VisiWinNET®«
Configuration of the OPC tunnel
120 L 2.5 EN - 01/2012
13.4.2 External visualisation (remote access)
[13-2] External visualisation using a visualisation IPC (Visu) and a control IPC (controller)
The »VisiWinNET®« application of the external Lenze IPC (Visu) accesses the OPC server of
the control IPC (controller) via the OPC tunnel. In the example, the IP address of the IPC
(controller) is: 192.168.5.99
For configuring OPC tunnel 1, use the oct.xml configuration file in the
\storage\OCT directory. Enter the corresponding IP address of the control IPC in the
configuration file (as described in the following section).
For configuring OPC tunnel 2, use the oct.xml configuration file. The standard
settings need not be changed.
Note!
For using an external visualisation, the oct.xml configuration file on the
visualisation IPC (Visu) must be adapted accordingly.
Przeglądanie stron 119
1 2 ... 115 116 117 118 119 120 121 122 123 124 125 ... 225 226

Komentarze do niniejszej Instrukcji

Brak uwag