Lenze EMF2113IB Instrukcja Użytkownika Strona 47

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 46
Commissioning
Ensure that the settings match the 2111 fieldbus module
7
Feldbus-Baugruppe 2113 INTERBUS
7.5
7.5.4
L
7.5-5
EDSIBS-1.0-06/2003
7.5.4 Ensure that the settings match the 2111 fieldbus module
OPEN
12345678
Length
PD
PCP
Length
Drivecom
Baud
ON
OFF
2113IBU005
S1 ... S8 Explanation
OFF
(Lenze setting)
The response is the same as of the Lenze fieldbus module 2111 INTERBUS”, if the
Lenze setting for the switches (S1 - S7 = OFF) and
codes L-C1910 = 4, L - C1911 = 1 and
L-C1912 = 1 remain unchanged.
7.5.5 Commissioning of 2113 fieldbus module
1. The fieldbus module must be attached to the controller ( 7.4-2).
2. The controller and if available the separate voltage supply for the 2113
fieldbus module must be switched on.
3. Check fieldbus module signals:
The green bus LED indicates the operating status according to the
corresponding description
( 7.4-1) Pos. 0.
The yellow bus LED indicates the communication status according to the
description
( 7.4-1) Pos. 1.
Quick blinking (8 Hz) is the reaction of the yellow bus LED to
impermissible settings. Please see chapter 7.7, Troubleshooting and fault
elimination.
4. You can now communicate with the drive.
With a PCP communication it is only possible to access the parameters of
the controller after having executed the PCP service Initiate
( 7.6-50).
5. It is then possible to access the parameters via the PCP services Read
and Write
( 7.6-50).
Show/Hide Bookmarks
Przeglądanie stron 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 118 119

Komentarze do niniejszej Instrukcji

Brak uwag