Lenze L-force I/O System 1000 Instrukcja Użytkownika Strona 19

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 99
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 18
2.0 EN - 11/2010 L 19
L-force Controls | I/O System 1000
Configuring the station structure
Creating a new project (select component from catalogue)
Step 2 - Properties
4. Enter the corresponding properties of the projects into the input fields (name,
order number, etc.).
You can always change the properties subsequently.
Later you will find the name as project name in the Project view.
5. Press Next.
Step 3 - Storage location
6. The Name entered before is suggested as project name. If required, change the
suggestion accordingly.
The project name is also the name for the project directory to be created.
Przeglądanie stron 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 98 99

Komentarze do niniejszej Instrukcji

Brak uwag