Lenze CANopen Controller-based Automation Instrukcja Użytkownika Strona 97

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 110
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 96
13 Defining the minimum cycle time of the PLC project
13.2 Optimising the system
97
Lenze · Controller-based Automation · CANopen® Communication Manual · DMS 6.3 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
13.2 Optimising the system
How to optimise the system:
1. Use the menu command Online Login, or log in on the Lenze Controller with <Alt>+<F8>.
For this, the PLC program must be error-free.
With the log-in, the fieldbus configuration and the PLC program are loaded into the
Controller.
2. Check the task processing times.
3. Optimising the cycle times:
If technologically required, the cycle times of the remaining tasks with lower priorities
can be decreased.
Condition: No task with a low priority must assign more than 60 percent of the
corresponding cycle time in its task utilisation.
Przeglądanie stron 96
1 2 ... 92 93 94 95 96 97 98 99 100 101 102 ... 109 110

Komentarze do niniejszej Instrukcji

Brak uwag