Lenze EtherCAT Controller-based Automation Instrukcja Użytkownika Strona 162

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 205
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 161
11 Defining the cycle time of the PLC project
11.2 Optimising the system
162
Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
11.2 Optimising the system
How to optimise the system:
1. Use the menu command Online Login, or log in on the Lenze Controller with <Alt>+<F8>.
For this, the PLC program must be error-free.
With the log-in, the fieldbus configuration and the PLC program are loaded into the
Controller.
2. Check the task processing times.
3. Optimising the cycle times:
If technologically required, the cycle times of the remaining tasks with lower priorities
can be decreased.
Condition: No task with a low priority must assign more than 60 percent of the
corresponding cycle time in its task utilisation.
Przeglądanie stron 161
1 2 ... 157 158 159 160 161 162 163 164 165 166 167 ... 204 205

Komentarze do niniejszej Instrukcji

Brak uwag